16-August-2018 will arrive in Europe in 3 weeks.
Home  > NEWS  > 

16-August-2018 will arrive in Europe in 3 weeks.

16-August-2018 will arrive in Europe in 3 weeks.

2018-11-09

On 16th August, a 40’HQ container which filled up with 1500 PCS GSL series low bay light and FLA series flood light was shipped to Yantian port, will arrive in Europe in 3 weeks.


GSL series low bay light include 80W, 100W, 150W, 200W, 240W, square appearance, IP65 protection grade. PC cover, ultrathin design, suspension, recessed, surface mounting and other installation methods.Use Meanwell ELG driver, SMD3030 LED chips, whole lamp 5 year warranty, light efficiency update to 140lm/w.UL,DLC,TUV ,SAA, RoHS Listed, perfect for food factory, gas station, gym, departure hall etc.



Chat Online inputting...